RV sequence Attributes
- RV – Measurements:030-040-050-063-075-one zero five-one hundred ten-a hundred thirty-a hundred and fifty
- Enter Alternatives: with input shaft, With Sq. flange,With Enter Flange
- Enter Electrical power .06 to 11 kW
- RV-Size from 030 to 105 in die-forged aluminium alloy budy and more than one hundred ten in solid iron
- Ratios amongst five and one hundred
- Max torque 1550 N.m and admissible output radial loads max 8771 N
- Aluminium units are equipped comprehensive with synthetic oil and allow for universal mounting positions, with no need to modify lubricant quantity
- Worm wheel: Copper (KK Cu).
- Loading capacity in accordance with: ISO 9001:2015/GB/T 19001-2016
- Dimensions 030 and above are painted with RAL 5571 blue
- Worm equipment reducers are CZPT with diffferent combos: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
- NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
- Possibilities: torque arm, output flange, viton oil seals, lower/large temperature oil, filling/drain/breather/degree plug,Little hole
Basic versions can be utilized to a broad selection of power reduction ratios from five to 1000.
Warranty: One year from day of shipping and delivery.
WORM GEARBOX | |||||
SNW SERIES | Output Velocity Variety: | ||||
Kind | Old Kind | Output Torque | Output Shaft Dia. | 14rpm-280rpm | |
SNW030 | RV030 | 21N.m | φ14 | Applicable Motor Power: | |
SNW040 | RV040 | 45N.m | φ19 | .06kW-11kW | |
SNW050 | RV050 | 84N.m | φ25 | Enter Options1: | |
SNW063 | RV063 | 160N.m | φ25 | With Inline AC Motor | |
SNW075 | RV075 | 230N.m | φ28 | Enter Options2: | |
SNW090 | RV090 | 410N.m | φ35 | With Square flange | |
SNW105 | RV105 | 630N.m | φ42 | Input Options3: | |
SNW110 | RV110 | 725N.m | φ42 | With Enter Shaft | |
SNW130 | RV130 | 1050N.m | φ45 | Input Options4: | |
SNW150 | RV150 | 1550N.m | φ50 | With Enter Flange |
CZPTshine Drive
ZheJiang CZPTshine Push Co.,Ltd,the predecessor was a condition-owned armed forces mould business, was set up in 1965. CZPTshine specializes in the total power transmission resolution for higher-finish tools manufacturing industries based on the purpose of “Platform Solution, Software Design and Expert Support”.
CZPTshine have a sturdy technological power with more than 350 workers at current, which includes in excess of thirty engineering experts, thirty quality inspectors, covering an area of 80000 sq. meters and kinds of innovative processing equipment and testing equipments. We have a very good basis for the market application development and provider of substantial-end speed reducers & variators possessing to the provincial engineering technological innovation investigation centre,the lab of equipment speed reducers, and the foundation of present day R&D.
Our Staff
Good quality Management
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
is a product inspection to determine the qualified products.
Packing
Supply